GEO Home
Home  |   Partners  |   Help us build GEO  |   About Us  |   Contact Us

Login to submit data



Quick Access Tools

Abstract

Beverley Uranium Mine, South Australia is located at 48 km NW of Belcanoona, South Australia. Location coordinates are: Latitude= -30.19075, Longitude= 139.59473. This infrastructure is of TYPE Uranium_Mines and CATEGORY Fuels and Resources. It has 1 unit(s). The first unit was commissioned in 2001. It is operated by Energy Resources of Australia, a 68% subsidiary of Rio Tinto Group..

Identifiers for Uranium Mines

Name
Status of Mine
Mine Efficiency and Impact
Mine Overall Rating State-of-the-artWorth DuplicatingEnvironmentally Responsible
Country Assigned Identification Number
GEO Assigned Identification Number
Select Currency for data in this page

Location

Draw Lines:
Draw Polygons:
pxpx

Description

Location
Geological Formation
Type Of Mine Give Brief Description
Date Mining Area Discovered (yyyy-mm-dd)
Date of (anticipated) Depletion (yyyy-mm-dd)
Date Mining Started (yyyy-mm-dd)
Purity of U3O8 in ore (% Range) -
Total Mining Capacity (U3O8 tonnes/year) (U tonnes/year)
Number of Mine Units
Uranium Ore Exported To (Countries)
Uranium Ore Evacuated By To Facility Name
Uranium Mill Processing Capacity (U3O8 Tonnes/year)
Uranium Extraction Methods Used LeachingIn-situ LeachingHeap LeachingTank LeachingCounter Current Decantation (CCD)Ion Exchange (IX)
Source of Water
Waste and Produced Water Management
Disposition of Tailings
Environmental Issues
Capital Cost Of Mine and/or In US Dollars In Year (YYYY)

Unit Information

Unit # Mine Unit Name Date Commissioned (yyyy-mm-dd) Decommission Date (yyyy-mm-dd) Production Capacity (Tonnes U3O8/year) Cost to Develop this Unit U3O8 Concentration (%) Seam Thickness (m) Seam Depth Below Surface (m)
1

Environmental Issues

Issue 1 Description

Past and Future Major Upgrades

Upgrade 1 Cost Year -

Owner and Operator Information

Owner 1 % Share
Type of Ownership
Construction/EPC Contractor
Operating Company
Regulatory Authority
Project Financed By

Annual Performance

Comments

Comment 1
Comment 2

References

Reference 1
Reference 2
Reference 3
Reference 4
Reference 5
Reference 6

Notes

* Australian fiscal and data reporting year is from 1 July - 30 June. Date Convention used by GEO: Year 2006 represents 1 July 2006 to 30 June 2007.