Nevada Solar One Power Plant USA is located at Near Boulder City, Nevada, USA. Location coordinates are: Latitude= 35.793482415825, Longitude= -114.97870591346. This infrastructure is of TYPE Solar_Thermal Power Plant with a design capacity of 64 MWe. It has 1 unit(s). The first unit was commissioned in 2007. It is operated by Acciona Solar Power.

Identifiers for Solar Thermal

Name
Status of Plant
Plant Efficiency and Impact
Plant Overall Rating State-of-the-artWorth DuplicatingEnvironmentally Responsible
Country Assigned Identification Number
GEO Assigned Identification Number
Select Currency for data in this page

Location

Draw Lines:
Draw Polygons:
pxpx

Description

Design Capacity (MWe Peak)
Firm Capacity (MWe Peak)
Average Annual Generation GWh
Location
Solar Insolence DNR (kWh/sq m/day) Power (Watts/sq m) Details
Type of Plant Short Description
Area of Collectors (Land Area)
Type of Panels Model Details
Type of Heat Collecting Element (HCE) Model Details
Type of Heat Transfer Fluid (HTF) Details
Operating Temperature of HTF Input Temp (degC) Output Temp (degC)
Type of Turbine Details
Electric Power Grid Connected To Name/Operator PPA(years)
Name of SubStation Connected To
Grid Feed In Tariff (per MWh in selected currency) For Number of Years
Energy Storage System Storage Capacity (hrs) Details
Thermal Storage (Tank Volume cum) (MWh heat)
Backup Power System Details
Fuel Type for Startup/Backup Source of Fuel
Source of Water
Water Withdrawal Rate at Full Power (cum/hour) Usage Rate (Liters/kWh)
Cogen Mode: Steam Supplied To (Tonnes/hour) Description
Future Development Plans
Capital Cost Of Plant and/or In US Dollars In Year (YYYY)

Unit Information

Unit # Capacity (MWe) Date Commissioned (yyyy-mm-dd) Decommission Date (yyyy-mm-dd) Number of Panels Panel Manufacturer HCE Manufacturer Turbine Manufacturer Turbine Model/Type Energy Storage Manufacturer Solar to Electric Efficiency (%)
1

Environmental Issues

Issue 1 Description

Past and Future Major Upgrades

Upgrade 1 Cost Year -

Owner and Operator Information

Owner 1 % Share
Owner 2 % Share
Type of Ownership
Construction/EPC Contractor
Operating Company
Regulatory Authority
Project Financed By

Annual Performance

Comments

Comment 1
Comment 2

References

Reference 1
Reference 2
Reference 3
Reference 4
Reference 5

Notes

* USA: All data under GWh generated in Performance Table is Net Generation (total-consumed by plant)
* MWe = Megawatts electric